Step 1: Plan placement and call for utilities
Before you dig, call 811 or your local utility locating service to mark underground lines. Choose a spot that is visible from the street, clear of overhead wires, and at least 6–10 feet from sidewalks or driveways to avoid future conflicts.
- Call 811 for utility locate before digging
- Pick a spot visible from the street with no overhead wires
- Allow room for the flag to fly without touching structures


